Chapter 02Construction
Sea Heaven
Both towers are at full height; the pool shells are cast and the interiors are under way. Completion 2027.
3.1A · 3.1B · Construction record · June 2025 – August 2026
7F + R01
Twelve records, one story: from a cleared site to two topped-out towers
Monthly site photos from June 2025 to August 2026. The structure is complete; next come the façades, interiors and the pools, with completion in 2027.
- StructureTopped out on both towers
- Pool shellsCast on the roof and in the courtyards
- InteriorsMasonry, plaster and ceiling frames
- Completion2027
Next instalment: 30% — structure complete (est. Q4 2026).
Both towers at full height: seven floors and the roof. The rooftop and courtyard pool shells are cast; the façades are under netting.
Structure topped out, towers in scaffold netting. Inside the homes: block walls, plaster and ceiling frames.
Both frames close to full height.
Upper-floor slabs; the first interior walls on the lower floors.
The structure rises several floors on both towers.
Floor slabs going up; the lower floors are framed over the whole footprint.
Columns and walls in aluminium formwork, the tower crane on site.
Ground-floor columns and wall formwork.
Foundations and lift pits cast.
Foundations: rebar cages and footings being formed.
The site cleared, first foundation works along the road.
Site preparation and the start of works on both towers.
1F · R02
What the towers are becoming
The ground floor with the lagoon pools and the roof with the pool deck and the sky garden — the developer's plans.
A | B→
See the site for yourself
We arrange a visit to the site and the sales gallery, or a video call from the building.
33 homes left: 26 in Tower A, 7 in Tower B, from THB 5M.
A | BClosing form
A floor, a view or a budget — we answer with real homes
Name a unit code such as A709, or just the tower and the view. We reply with the free homes, the price and the next steps.